A small selection of our completed projects
SIB-Engineering GmbH provided various engineering services for Steelwind Nordenham GmbH.
view projectThe task was to perform a fatigue analysis of a frame used for wind tower section transport on vessel and SPMT.
view projectThe task was to perform a structural analysis of a shielding door constructed for nuclear power plant (Unterweser).
view projectThis tool is designed to upend and install an outfitted hub plate during wind turbine manufacturing process.
view projectThis tool series is designed and manufactured to store, transport and lift various offshore wind turbine components.
view projectThe task was to design a light offshore crane used for lifting of small wind turbine components during maintenance works.
view projectRemotely operated Rotor Fixation Tool is designed and manufactured to fix the rotor star of Adwen 5MW wind turbine generator.
view projectThe frame series is designed and optimized for coil storage of various diameter and thicknesses.
view projectThe frame is designed for bearing storage of two different bearing diameter.
view projectThe task was to analyse an existing gantry crane. The goal of the analysis was to detect highly loaded truss members and create a customized examination / maintenance plan.
view projectThe task was to analyse and optimize pressure vessels.
view projectThe storage frame is designed for a pipe lifting tool used by a reach stacker.
view projectThis lug is designed for lifting and fastening purposes of tower base rings.
view projectThe task was to design and manufacture a tool for precise anemometer alignment on offshore wind turbines.
view projectThis C-Hook is designed to lift monopile segments weighing up to 127t.
view projectThe task was to design and manufacture various help tools required for wind turbine production.
view projectThe task was to design customized platforms and ladders required for 8MW wind turbine production.